PQM201A Mod 5 – Situations calling for a cost estimate during a weapons systems procurement where there is lack of time for collection and analysis

PQM201A Mod 5 – Situations calling for a cost estimate during a weapons systems procurement where there is lack of time for collection and

analysis of historical data, or a lack the historical data itself, or if the design is incomplete, the most likely estimating

technique to use would be:

A. Handbooks and Indices since everything has already been listed for rapid retrieval

B. Engineering method since only engineers could provide a reliable estimate

C. Expert Opinion

D. No estimate should be provided since the design is incomplete

Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount